Wed 2 Jul 2008
June
The floor in brighton was sanded to perfection and took only 2 days to sand and seal with a clear varnish. day one the furniture was removed and was replaced on day 2 on the understanding that furniture was to be placed in position and not scraped along the floor which could damage it. the floor looks perfect!!